Firm predicts it will cost $28 billion to build a 2nm fab and $30,000 per wafer, a 50 percent increase in chipmaking costs as complexity rises

12 Comments

  1. Double-Low-9394

    Just cross those fingers and hope for an Intel redemption story, for real. We need the competition.

  2. Assaltwaffle

    Given that we’re on 5-7nm for most things right now, I don’t think this is an immediate worry.

  3. Orange2Reasonable

    Insane. And chipsmakers would do everything to be the tech leader

  4. Bobbler23

    Or, here is the pre-release narrative we are putting out now to justify a 100% increase in CPU costs in 3 years time from the company that runs the Japanese stock market index…

  5. kermit_the_roosevelt

    I disagree with the post, but I love the write up

  6. giratina143

    Now please release info about this firm and who asked for this prediction.

    I will bet it’s someone who will profit off higher cpu prices lol

  7. ItzCobaltboy

    Scientific talk here,

    When you are fabricating big transistors(50nm things), there’s isn’t much effect of Magnetism due to bunch of electrons moving in different directions

    But when you start making the transistors smaller like 4-5nm process, which is equivalent to 5-20 Atom Width(1nm is 10 Å, size of a Hydrogen atom is 0.529 Å approx), charge attraction and repulsions become a pain in ass

    Plus let alone be the R&D required to design a method to make such small connections in a Format that it makes a processor…

    If you try to understand the complexity of the system, one will realise that what we pay to buy Processors is far too less according to complexity of the design, sole credit for prices goes to Mass Manufacturing

    However I have no idea on how many times price increase

  8. major_jazza

    What’s the point. Surely this is the last stop if we haven’t reached it already. Isn’t quantum computing the new thing anyway

  9. lexsanders

    Bla bla bla where 6 ghz cpu and 4ghz gpu.

  10. soggybiscuit93

    TSMCs N3 and Intel 3 are important nodes for both – they’re both fabs’ last FINFET nodes. They’re going to be ordered by customers for a while, and future nodes with GAAFET are going to be costly.

Write A Comment